The Best Projects for Vacuum Blasting

Vacuum blasting, although very clean, is slow and meticulous work. For that reason – (it slows productivity) – it’s not the most practical choice for most blasting projects.

However, our 4+ decades of industry experience finds there are a few scenarios where vacuum blasting is the smart option.

Vacuum blasting requires a high-pressure vacuum built into a specifically designed workhead that brings both blast and vacuum together at the blast surface.

Vacuum blasting can’t be rushed. Productivity tends to max out at 50 ft2/hr (5 m2/hr) and that’s when you’re blasting large flat surfaces with easy access. Projects requiring- say, the vacuum blasting of pipework, will more likely max out around 10-20 ft2/hr (1-2 m2/hr).

When should a contractor consider vacuum blasting?

  • Small touch up jobs
  • Jobs where access is hard
  • Where you don’t want to put up encapsulation.
  • Removing a hazardous coating in an environment where you cannot establish dust containment. *

*  Vacuum blasting effectively reclaims about 95% Dust and abrasive.

Read More Posts

How to Measure Surface Profile Using Testex Tape

Related Content Foundries and Castings Vacuum Recovery Steel Grit Trailer Squat Aftercooler AirDryer System

Preventing Dust Collector Fires

Related Content An introduction to an abrasive blasting machine Blast Hose – Heavy Wall Premium Blast Hose – SupaFlex