One of California’s largest utility sandblasters was struggling to meet their timeline for the project completion of a very large five million gallon tank. The 30 mil’s of coating had proved difficult to remove and had caused delays in the project schedule.

Solution

We tested GMAX GX2 Garnet, to remove the 30 mil coating, blasted at 150 sqft/hr which is twice as fast as they were blasting. Consumption of the GX2 Garnet was 900lbs/hr, much less than the slag. Dust levels were reduced by 70%, allowing the blasters to see a lot clearer.

Results

GMA GX2 Garnet Slag
Abrasive used 900 lbs 1,600 lbs
Area blasted 150 sqft 75 sqft
Hours blasted 1 hr 1 hr
Blasting production rate 150 sqft/hr 75 sqft
Abrasive consumption 6 lbs/sqft 21 lbs/sqft

The higher production allowed the contractor to complete the job on time avoiding any costly demurrage charges. The blasters were convinced that with GMA GX2 Garnet, they could get more done everyday, and go home 90% cleaner.

Email Sign Up

Receive our Primed Insights! Unsubscribe at anytime.
Click to Subscribe!

Add to quote:
  • *If you want to build extensive quotes, multiple quotes, and save to your account, please log-in or register.
  • This field is for validation purposes and should be left unchanged.
Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share

PREVIOUS PAGE
FORWARD PAGE