60% Greater Productivity using GMA ToughBlast

Job Details

A new crude oil tank. 46ft diameter by 21ft high with extreme mill scale on it.  Contractors were experiencing a very difficult time blasting it off.

Results

They first started off with KleenBlast 36 mesh Slag on the underside of the roof. Which is the 46 diameter, and about 3 1/2 feet down the sides – 2,200 sqft. They used 12 – two ton bags of Slag. And the blasting took them four days with two blasters.

Next we tested GX2, achieving a 3 ½ mil profile. They did 10 1/2 feet up the side of the tank all the way around out the inside of the tank – 1,500sqft using less than 3 bags. Blasting in one day with two blasters.

GMA ToughBlast
Slag
Abrasive Used
4,400 lbs
48,000 lbs
Area Blasted
1,500 sqft
2,200 sqft
Hours Blasted
16 hrs
64 hrs
Blasting Production Rate
93.8 ft2/hr
34.4 ft2/hr
Abrasive Consumption
2.8 lbs/ft2
21.8 lbs/ft2
Email Sign Up

Receive our Primed Insights! Unsubscribe at anytime.
Click to Subscribe!

Add to quote:
  • *If you want to build extensive quotes, multiple quotes, and save to your account, please log-in or register.
  • This field is for validation purposes and should be left unchanged.
Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share

PREVIOUS PAGE
FORWARD PAGE