How to Calculate ‘C’ Section Beam Surface Area for Your Project

When selecting and preparing ‘C’ section beams for your project, understanding the surface area per foot of length and per ton of weight is crucial. Below is a detailed chart for various ‘C’ section beams, including calculations for surface area with or without one flange side.

Section Designation Square Feet of Surface Area per Foot of Length Square Feet of Surface Area per Ton
Minus one flange side All around Minus one flange side All around
C-15
x 50
3.44 3.75 137.6 150.0
x 40
3.38 3.67 169.0 183.5
x 33.9
3.34 3.63 197.1 214.2
C-12
x 30
2.78 3.04 185.3 202.7
x 25
2.75 3.00 220.0 240.0
x 20.7
2.75 3.00 265.7 289.9
C-10
x 30
2.42 2.67 161.3 178.0
x 25
2.39 2.63 191.2 210.4
x 20
2.35 2.58 235.0 258.0
x 15.3
2.32 2.54 305.3 334.2
C-9
x 20
2.16 2.38 216.0 238.0
x 15
2.13 2.33 284.0 310.7
x 13.4
2.09 2.29 311.9 341.8
C-8
x 18.75
1.96 2.17 209.1 231.5
x 13.75
1.93 2.13 280.7 309.8
x 11.5
1.90 2.08 330.4 361.7
C-7
x 14.75
1.73 1.92 234.6 260.3
x 12.25
1.73 1.92 282.4 313.5
x 9.8
1.70 1.88 346.9 383.7
C-6
x 13
1.53 1.71 235.4 263.1
x 10.5
1.50 1.67 285.7 318.1
x 8.2
1.47 1.63 358.5 397.6
C-5
x 9
1.30 1.46 288.9 324.4
x 6.7
1.27 1.42 379.1 423.9
C-4
x 7.25
1.10 1.25 295.2 344.8
x 5.4
1.07 1.21 396.3 448.1
C-3
x 6
0.91 1.04 303.3 346.7
x 5
0.88 1.00 352.0 400.0
x 4.1
0.84 0.96 409.8 468.3
MC-18
x 58
4.06 4.42 140.0 152.4
x 51.9
4.03 4.38 155.3 168.8
x 45.8
4.00 4.33 176.7 189.1
x 42.7
4.00 4.33 187.4 202.8
MC-13
x 50
3.26 3.63 130.4 145.2
x 40
3.20 3.54 160.0 177.0
x 35
3.20 3.54 182.9 202.3
x 31.8
3.17 3.50 199.4 220.1
MC-12
x 50
3.03 3.38 121.2 135.2
x 45
3.00 3.33 133.3 148.0
x 40
2.97 3.29 148.5 164.5
x 35
2.94 3.25 168.0 185.7
x 37
2.91 3.21 157.3 173.5
x 32.9
2.88 3.17 175.1 192.7
x 30.9
2.88 3.17 186.4 205.2
MC-10
x 41.1
2.76 3.13 134.3 152.3
x 33.6
2.70 30.4 160.7 181.0
x 28.5
2.67 3.00 187.4 210.5
x 28.3
2.54 2.83 179.5 200.0
x 25.3
2.54 2.83 200.8 223.7
x 24.9
2.51 2.79 201.6 224.1
x 21.9
2.54 2.83 232.0 258.4
MC-9
x 25.4
2.38 2.67 187.4 210.2
x 23.9
2.38 2.67 199.2 223.4
MC-8
x 22.8
2.21 2.50 193.9 219.3
x 21.4
2.21 2.50 206.5 233.6
x 20
2.08 2.33 208.0 233.0
x 18.7
2.08 2.33 222.5 249.2
MC-7
x 22.7
2.07 2.38 182.4 209.7
x 19.1
2.04 2.33 213.6 244.0
x 17.6
1.92 2.17 218.2 246.6
MC-6
x 18
1.88 2.17 208.9 241.1
x 15.3
1.88 2.17 245.8 283.7
x 16.3
1.75 2.00 214.7 245.4
x 15.1
1.75 2.00 231.8 264.9
x 12
1.63 1.83 271.7 305.0
MC-3
x 9
1.03 1.21 228.9 268.9
x 7.1
1.00 1.17 281.7 329.6

DISCLAIMER: All and any tables, calculations, factors, formulas, etc ‘information’ on any of these pages are a guide only and shall not be taken as either the approved nor standard nor complying method nor formula nor calculation for any of the topics or aspects referred to, and neither is any claim made as to the completeness or accuracy of the ‘information’. It is the responsibility of the reader and/or users of this information to separately determine and verify the correct method, formula, factor, procedure, data, etc. for determining any such topics or aspects as directed or required or indicated in or by any work specifications and/or standards. Blast-One™ expressly disclaims any liability for the use or misuse of the ‘information’.

Read More Posts

Blast Hose Safety Checklist

BLASTHOSE SAFETY CHECKLIST Quick daily inspection steps for blast hose, couplings, and nozzle holders. Daily Use Checklist ✅ Daily Inspection Perform a visual check of the entire hose before blasting. Look for cracks, splits, bubbles, or holes in the outer casing. Inspect hose couplings for tight fit, damage, or excessive wear. ✅ Squeeze Test Squeeze […]

Add to quote:

Registration is required to create a Quote.

Click Here to Login or Register.

Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share