22% savings on total project cost using GMA ToughBlast

Job Details

Water tanks locating in Daytona, Ohio required blast cleaning. The tanks had an internal surface area of 28,000 sqft – with external surface of 45,000 sqft.

The tanks are supported by a large central riser column, and 12 legs around the circumference.  Access is via swing stages and catwalk platforms that are suspended between the columns.

Results

Tank #1: Coal Slag
Abrasive Consumption
380 tons
Total man-hours
1728
Nozzles Used
6 to 7 for 12 hrs/day
Downtime
570 man-hours. Disposal $22,000
Tank #2: GX2
Using 2 MegaBlasters with 1600cfm compressors
Abrasive Consumption
220 tons
Total man-hours
1350
Nozzles Used
5 to 6 for 10 hrs/day
Downtime
Minimal. Reloading once per day compared to 2-3x previously
Email Sign Up

Receive our Primed Insights! Unsubscribe at anytime.
Click to Subscribe!

Dayton Ohio Water Tower
Add to quote:
  • *If you want to build extensive quotes, multiple quotes, and save to your account, please log-in or register.
  • This field is for validation purposes and should be left unchanged.
Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share

PREVIOUS PAGE
FORWARD PAGE